Instead of delivering CLT to the construction site, as much as possible is now prefabricated in the hall, thanks to their assembly table and joinery system,
Gauye & Dayer SA
Assembly Tables, Panel Router, Pressing System, Vacuum Press: The complete equipment from woodtec for Timber Frame, CLT and Box Girders.
Max Fischer AG
The variety of frames being assembled on this 12 m self-built BIY Table is incredible. An efficient alternative to the modular Assembly Table or for starting Timber Frame.
Michel Randin SA
An assembly table as versatile as your own production. Came as a self-assembly kit. Featuring the pro version for predefining panel overlap.
Zimmerei Wolf GmbH & Co. KG
This construction company produces certified woodtec CLT in their own vacuum press. They thus save considerable cost on every project and are independent of big suppliers’ lead times.
FHS Holzbau
High flexibility in panel dimensions with the two vacuum presses. Surfaces in over 30 wood species. With clever automation for high output.
Rubner Holzbau Spa
Mit zwei voll mechanisierten Vakuumpressen deckt man in diesem Werk den gesamten Brettsperrholzbedarf der Unternehmsgruppe ab.
Fuchs Holzbaulösungen
Two assembly tables in two buildings for prefabricating personalized single family homes. The whole roofs are laid out before cutting them into transportable units.
Gaille Constructions SA
Separate Prefabrication of Wall Frames and Roof & Floor Cassettes in two buildings, with dedicated equipment from woodtec. Essentially for building single-family homes.
Hubert Constructions Bois SA
Separate assembly tables for first and second side processing. Arrangement in a line so that the tables can be connected to one single table for longer frames.
Schäfer Holzbautechnik AG
Assembly Platforms on the left and right sides of the plant, with space for material and transportation in the middle. The table and plant layout is optimized for each bigger project.
Künzli Holz AG
Work platform of 36 m length that can be divided in individual work stations, optimized for every project.
Beer Holzbau AG
This 42 m long assembly platform is divided into multiple work stations, organically to suite the project and optimize the space. One area is usually equipped for box girder manufacture.