Lengauer-Stockner GmbH
Schwoich, Austria
Team
- 38
Sectors
- Timber Construction
- Fassades
Interior - Renovation
Projects
- Single Family Houses
- Extensions
Commercial Buildings - Farm Buildings
In the past, a lot of CLT was assembled on site. Thanks to the assembly table and the joinery system, as much as possible is now prefabricated in the new workshop.
Prefabricate as much as possible
Assembly Table
12 mPanel Router
More from the Production
Joinery
With own joinery system
Panel Formatting
With Panel Router on the Frame
Frame Turn-Over
With Overhead Crane
Insulation
With Blow Plate for walls or lance for roofs
2nd side
The frame is transported to the next station for insulation and sheathing
Loading
Beforehand interim storage, now direct storage on swap-bodies
Impressions
The new assembly hall at Lengauer-Stockner GmbH